Takeoff pricing, wherever you are building
A construction takeoff is the measured schedule of quantities of a project, with nothing priced. You send yours; Pr3cise prices it line by line and returns it in Excel and PDF, coded to CSI MasterFormat, NRM, or the way your own market works. We do not measure drawings.
Pr3cise is a remote estimating office — Clear Ascend OÜ, registered in Estonia — that prices quantity takeoffs for general contractors, subcontractors, developers and architects, primarily in the State of Florida and across Europe and the rest of the world, in English and Spanish. A priced takeoff is normally delivered within 24 to 72 hours of a complete takeoff, at a fixed fee per project agreed in writing before work starts. Every line is priced directly by a technical architect with decades of building construction experience, and arrives with its unit-price breakdown: material, labour and equipment.
Most contractors who reach this page already have the quantity takeoff — from their own team, their architect or a takeoff tool — plus a tender date and an estimator already pricing two other jobs. What they need is the money side done properly, on quantities they trust.
That is the whole service. You send the takeoff, a technical architect prices it line by line, and it comes back with a unit price and a total on every line. Your quantities are not changed, and nothing is rolled into a lump sum to cover a gap.
Pr3cise is an estimating office, not a staffing agency and not a software licence: you send a takeoff, a technical architect prices it, and the estimate comes back — how the office works — and you can read real deliverables in the Pr3cise sample estimates.
What a construction takeoff is, and where it stops
A construction takeoff is the measurement stage of a bid: how much of each item the drawings contain, in its proper unit — square metres or square feet, linear metres or feet, cubic metres or cubic yards, tonnes, each. Nothing is priced. The output is a schedule of quantities, not money.
An estimate is that same measurement with cost attached: labour, material, equipment, waste, overhead and profit. The two words get used interchangeably, and that causes arguments, so we say it plainly: the quantity takeoff is yours, and the pricing is what Pr3cise adds.
If you do not have a takeoff yet, get the measurement done first — by your own team, your design team or a takeoff provider — and then send it to us. If you do, the Pr3cise estimating service turns it into a bid-ready number. A priced takeoff has the virtue of being checkable: anyone can pick a line, see the quantity, the unit price and the build-up, and confirm the total — which is exactly what our guide on how to review a contractor’s estimate walks through, line by line.
What gets priced, trade by trade
Every trade has its own units, and its own habitual omissions — the ones that cost money.
Concrete, masonry and rebar
Concrete priced by mix and pour, formwork by contact area, rebar by weight, blockwork by unit size, in the units your takeoff uses.
Structural steel and framing
Members priced by weight, connections and base plates as their own items, stud partitions by length with gauge and height kept apart.
Electrical
Devices and fixtures priced each, branch circuits by conductor size, conduit by diameter and run type, gear and transformers priced as equipment.
Plumbing and piping
Underground priced apart from above-ground: different crews, different risk. Pipe by material and diameter, fittings and valves as items, fixtures against the schedule.
Mechanical and HVAC
Ductwork by sheet weight and gauge, equipment priced by tag, grilles and diffusers by type, hangers and insulation priced as lines rather than allowed for.
Envelope, finishes and sitework
Doors and windows priced by type and size, glazing by area and type, roofing by assembly, drywall by face, earthwork by cut and fill.
One trade or the whole building. For other kinds of estimate, the full range of estimating services covers the same trades.
Deliverable formats: Excel, PDF and the coding your market tenders in
- An Excel workbook and a PDF of the same content. One row per line of your takeoff, with your quantity and unit and our unit price and total in their own columns, so you can filter it, pivot it or send a trade out to a supplier.
- The build-up behind each price. Material, labour and equipment shown separately, with waste and productivity stated. That is what makes a price auditable: pick a line, read how it was built.
- CSI MasterFormat coding, division by division, so the priced takeoff drops into the structure your bid and accounting software already expects.
- NRM2 or SMM bills of quantities, priced item by item where the tender calls for one, keeping the descriptions a quantity surveyor expects.
- Capítulos and partidas (BC3) — each partida of your mediciones priced, with its measurement lines kept as you sent them.
- A bill of quantities to POMI or NRM2, priced for FIDIC-based contracts, as the documents require.
- Imperial or metric, as your takeoff is, consistent throughout, plus a written scope and exclusion list: what was priced, what was not, what the takeoff left ambiguous.
If you have your own template, send it — pricing into a form your team already reads beats anything Pr3cise would choose.
| Standard or structure | Typical use | Delivered as |
|---|---|---|
| CSI MasterFormat | Division-by-division pricing that drops into your bid and accounting software | Excel and PDF, imperial or metric |
| NRM2 or SMM bill of quantities | Tenders that call for a bill of quantities; NRM1 at cost-plan stage | Excel and PDF |
| Capítulos y partidas | Mediciones y presupuestos: each partida of your mediciones priced, measurement lines kept | BC3 as well as Excel and PDF |
| POMI or NRM2 bill of quantities | FIDIC-based tenders, as the documents require | Excel and PDF |
| Eurocodes and their national annexes | European projects, priced in the structure the tender asks for | Excel and PDF, metric |
| Your own bid template | Whenever you send one | Your template, plus Excel and PDF |
How to send us your takeoff
The only thing that genuinely delays pricing is an item nobody can identify, so clear descriptions in your takeoff matter more than the file format.
Send your takeoff
Email the Excel file or PDF to contact@pr3cise.com, or link to wherever it already lives: a shared drive, a project portal, a transfer link. Excel is fastest, but nothing needs converting. Include specifications, addenda, schedules and your date.
Scope, fee and date in writing
We read your takeoff before quoting, then confirm the scope, the fixed fee and the delivery date in writing. If your deadline is not realistic for the size of the takeoff, we say so then, not later.
Pricing
Each line of your takeoff is priced in turn: material, labour and equipment at the rates of your market. Areas, lengths, counts and volumes stay in your own units. Gaps and inconsistencies are logged, not assumed away.
Delivery and one revision
You get the workbook and the PDF, with the assumptions and the question list. One revision round is included: an addendum, a scope change, a section repriced.
What happens when the takeoff is incomplete
Almost every takeoff is incomplete somewhere. A unit is missing, a description stops at a product family and leaves the selection open, a trade is measured in one section and forgotten in another, or a quantity is carried as a lump. None of that stops the pricing.
We price everything the takeoff genuinely answers and split the rest into two lists. Written assumptions, each attached to the lines it affects so it is easy to overturn: tell us the partition is rated rather than standard, and those lines are repriced. And questions for whoever measured, written so you can forward them as an RFI.
What we never do is change or invent a quantity quietly and let it sit in the workbook looking like yours. That is the most expensive habit in this trade: it hides risk exactly where a bid review would find it. We set out how it unravels in the risks of an inaccurate construction estimate.
Turnaround, and what a time zone actually buys you
A priced takeoff comes back in 24 to 72 hours. Which end depends on the takeoff, not on what you are willing to pay: a single trade with clean descriptions sits at the fast end, a full multi-trade package with open questions at the slow one. The date and the fixed fee are agreed before work starts — no hourly billing.
The time zone works for you. Our day starts seven hours ahead of US Eastern Time for most of the year (six hours during seasonal DST transitions) and an hour ahead of Central European Time, so a takeoff sent at the end of a Florida afternoon is priced overnight; for clients in Europe and further east our working day overlaps yours, and a question raised in the morning is answered the same afternoon. Which is why it is worth saying if the tender closes on Friday — we would rather decline than hand back a rushed estimate.
Takeoff pricing near you — which, in this trade, means anywhere
Pricing happens on your takeoff, not on site. That is why estimating services near me behaves differently here than for a plumber: it really asks whether a firm covers your market, knows the code your project is permitted under, and delivers in the format your tender demands.
We work primarily for contractors in the State of Florida, and for clients across Europe and around the world, with no border limits, in English and Spanish. What changes between markets is not the arithmetic — a cubic metre of concrete is a cubic metre everywhere — but the rates, the classification, the units and the description conventions.
Florida is our primary focus, and South Florida is where most of that work sits: projects in Miami-Dade fall inside the High-Velocity Hurricane Zone, which changes assemblies and therefore prices throughout a building, so it has its own page on construction estimating in Miami. That is a specialism, not a boundary — a job anywhere in Europe or elsewhere in the world gets the same method and the same pricing directly by a technical architect. If you need a standing arrangement rather than one package, read the case for outsourced construction estimating.
Takeoff pricing FAQs
A takeoff is the measurement: how much of each item the project contains, in its proper unit, with nothing priced. An estimate is that measurement with money attached — labour, material, equipment, waste, overhead and profit. Pr3cise does the second half: you bring the takeoff, we attach the money. We do not measure drawings.
However it already exists. Email the Excel file or PDF to contact@pr3cise.com, or send a link to wherever it lives: a shared drive, a project portal, a file-transfer link. Excel is fastest; an export from your takeoff software works too. A scanned sheet is fine as long as the items, units and quantities are legible.
Yes, and most takeoffs are incomplete somewhere. Pr3cise prices everything the takeoff genuinely answers and returns the rest as two short lists: written assumptions, each one easy to overturn, and questions for whoever measured it. What Pr3cise never does is invent a quantity silently and let it read as yours.
Pr3cise delivers an Excel workbook you can filter and formula against and a PDF of the same content, with your line items and quantities kept and a price on every one. Coding follows your tender: CSI MasterFormat, an NRM2 or SMM bill of quantities, capítulos y partidas (BC3), or your own bid template.
Pr3cise works remotely, primarily for contractors in the State of Florida and for clients across Europe and around the world, with no border limits, in English and Spanish. Pricing happens on your takeoff, not on site, so distance changes nothing — and a team several time zones ahead prices it overnight.